Legrand 054000 Metal Back Box for Pop-Up Floor – 3 Modules, Concrete Floor Installation.
Overview
Legrand 054000 is a metal back box designed for installing Legrand Pop-Up floor units in concrete floors. It is suitable for 3-module Pop-Up floor installations and is used with conduits up to 20mm diameter. The back box is supplied with a protection cover to prevent concrete from entering during pouring.
Key Features
• Original Legrand metal back box.
• Designed for Pop-Up floor installation.
• Suitable for 3 modules Pop-Up units.
• For concrete floor installations.
• Used with 20mm conduits.
• Supplied with protection cover for concrete pouring stage.
• Designed to support clean and professional floor service point installation.
• Compatible with Legrand Pop-Up floor range for power floor outlet solutions.
Technical Specifications
• Brand: Legrand.
• Product Range: Pop-Up Floor.
• Model / Reference: 054000.
• Catalogue Reference: 0 540 00.
• Product Type: Metal Back Box.
• Compatible Pop-Up Capacity: 3 Modules.
• Installation Type: Concrete Floor.
• Back Box Material: Metal.
• Conduit Compatibility: 20mm diameter conduits.
• Minimum Screed Depth: 60mm.
• Dimensions: 100 x 100 x 61.2mm.
• Concrete Floor Fixing Centre: 84mm.
• Protection Cover: Included.
• Compatible System: Legrand Pop-Up floor range.
• Related Standards: NFC 61-314 / EN 60670-1 / EN 60670-23.
Applications
• Concrete floor Pop-Up installations.
• Office floor power points.
• Meeting rooms and conference rooms.
• Commercial buildings.
• Showrooms and reception areas.
• Workstations requiring floor electrical access.
• Projects using Legrand Pop-Up floor units.
Connect Gates Recommendation
We recommend Legrand 054000 when installing a 3-module Legrand Pop-Up floor unit in concrete floors. It is an essential installation accessory that helps keep the Pop-Up properly fixed, aligned, and protected during the concrete stage.
It is especially important to use the supplied protection cover before pouring concrete to avoid any blockage or installation issues later. For professional projects, the back box should be coordinated early with civil and electrical works to ensure correct conduit entry, screed depth, and final floor level.
Documents